You can move a node to another backup plan, change how its backups are compressed, and change which paths are left out, all with Change Schedule. The node keeps its existing recovery points.
Before you begin
Section titled “Before you begin”The node must be running, with its first backup finished.
Change the plan, compression, or excluded paths
Section titled “Change the plan, compression, or excluded paths”- In Manage CDP Backups, open the node’s Actions menu and click Change Schedule. Backup Schedule Configuration opens with the current settings. You can also open it with the pencil beside Backup Schedule Mode on the node’s CDP Backup Details tab.
- To back up more or less often, or to keep recovery points for longer, choose another plan in Select backup schedule mode. The dialog shows how often the new plan runs and which recovery points it keeps. The new plan updates the recent, daily, weekly, and monthly counts. The yearly count stays as it was set when you turned backup on.
- To change compression, choose ZLib or QuickLZ in Compression Type, and for ZLib a Compression Level. The higher the level, the smaller and slower each backup.
- To change which files are left out, edit the paths in Exclude folder/file, separated by
commas. Each path must be absolute, such as
/var/logon Linux orC:\Windows\Tempon Windows. The field refuses/on its own and any path that contains//. To back up everything again, clear the field. If/e2e-backup-restoreis listed, keep it. MyAccount adds this path after a restore to keep restored files out of the backup. - Click Change Schedule. The button is available once you have changed something.
You set encryption when you turn backup on, and this dialog has no encryption setting. Turning backup off deletes every recovery point the node has. To change encryption, turn backup off and turn it on again. See Backup encryption.
Check the new schedule
Section titled “Check the new schedule”On the node’s CDP Backup Details tab, Backup Schedule Mode shows the new plan, and Backup Schedule Time (IST) and Next Backup Scheduled Run show when it runs next.
The next backups follow the new settings. To run one straight away, see Run a backup now. If Change Schedule is not available, see Troubleshooting CDP Backup.