Start a run of a pipeline version. You choose the pipeline and version, an experiment to keep the run under, one resource plan for the whole run, and any parameter values. Any pipeline with at least one version can run.
Start a run
Section titled “Start a run”Select Create Run on a pipeline in Manage Pipelines or on a version in Pipeline Versions, or in Pipeline Runs or Scheduled Jobs. Starting from a pipeline or version selects it for you.
Fill in the run details
Section titled “Fill in the run details”- In Run Name, keep the generated name or type your own, up to 30 characters.
- In Pipeline and Pipeline Version, check the selection. You can also create a new pipeline or version right there.
- (Optional) In Run Description, add up to 300 characters.
- In Experiment, choose one. An experiment keeps a record of the pipelines and runs started under it. To make one, use the link beside Experiment to open Create Experiment, type a Name of up to 30 characters, optionally a Description of up to 300 characters, and select Create.
Choose the plan
Section titled “Choose the plan”Under Select Computing Resource, pick a GPU or CPU plan, then its size in Configuration: the vCPUs and RAM, and for a GPU plan the number of GPUs. A plan marked Inventory not available or Plan not available is out of stock. Under Instance Pricing, pick a price: On-Demand is hourly, and Show more pricing has any others. The whole run uses this one plan, and it is billed by the minute at the plan’s hourly price. Use a CPU plan for steps that prepare or move data and a GPU plan when the work is training. See Billing and plans for pipeline runs.
Set the parameters
Section titled “Set the parameters”Under Run Parameters, an Argo file’s parameters start at their default values. Change a value to use a different one for this run. Select Add Parameter to add a Key and a Value; both are required.
To repeat the run on a schedule, turn on Enable Scheduled Run on this form; see Schedule a run.
Start it
Section titled “Start it”Select Create Run. You return to Manage Pipelines, where the run shows in Recent Runs and on the Pipeline Runs tab. For help with a run refused for capacity or credit, see Troubleshooting Pipelines.
To follow the run, watch it and read its logs.
Was this page helpful?