Skip to content

Create a run

View as Markdown

Start a run of a pipeline version. You choose the pipeline and version, an experiment to keep the run under, one resource plan for the whole run, and any parameter values.

You need a role with create permission on the pipeline service and a pipeline with at least one version.

Select the icon in the Create Run column of a pipeline in Manage Pipelines. The same icon is in the Create Run column of Pipeline Versions, and the Create Run button is on Pipeline Runs and Scheduled Jobs. When you open the form from a pipeline or version, that pipeline and version are already selected.

  1. In Run Name, keep the generated name or type your own, up to 30 characters.
  2. In Pipeline and Pipeline Version, check the selection. To make a new pipeline or version right from the form, use the link beside the field. It opens the create form in a side panel, and you return to the run form with the new item selected.
  3. (Optional) In Run Description, add up to 300 characters.
  4. In Experiment, choose one. An experiment keeps a record of the pipelines and runs started under it. To make one, use the link beside Experiment to open Create Experiment, type a Name of up to 30 characters, optionally a Description of up to 300 characters, and select Create.

Under Select Computing Resource, pick a GPU or CPU plan, then its size in Configuration: the vCPUs and RAM, and for a GPU plan the number of GPUs. A plan marked Inventory not available or Plan not available is out of stock. Under Instance Pricing, pick a price: On-Demand is hourly, and Show more pricing has any others. The whole run uses this one plan, and it is billed by the minute at the plan’s hourly price. Use a CPU plan for steps that prepare or move data and a GPU plan when the work is training. See Billing and plans for pipeline runs.

Under Run Parameters, an Argo file’s parameters start at their default values. Change a value to use a different one for this run. Select Add Parameter to add a Key and a Value; both are required.

To repeat the run on a schedule, turn on Enable Scheduled Run on this form; see Schedule a run.

Select Create Run. You return to Manage Pipelines, where the run shows in Recent Runs and on the Pipeline Runs tab. For help with a run refused for capacity or credit, see Troubleshooting Pipelines.

To follow the run, watch it and read its logs.